Resource Type

Journal Article 573

Year

2024 1

2023 46

2022 36

2021 25

2020 34

2019 26

2018 22

2017 44

2016 20

2015 34

2014 19

2013 20

2012 17

2011 28

2010 57

2009 24

2008 23

2007 29

2006 11

2005 8

open ︾

Keywords

large-scale 6

building information modeling 5

BIM 4

China 4

development 4

Arsenic 3

CFD 3

industrial 3

project management 3

seismic response 3

Activated sludge 2

Additive manufacturing 2

Adsorption 2

Anammox 2

Bacterial community 2

Building 2

Building Information Modeling 2

Compressed sensing 2

aerodynamics 2

open ︾

Search scope:

排序: Display mode:

Automatically building large-scale named entity recognition corpora from Chinese Wikipedia

Jie ZHOU,Bi-cheng LI,Gang CHEN

Frontiers of Information Technology & Electronic Engineering 2015, Volume 16, Issue 11,   Pages 940-956 doi: 10.1631/FITEE.1500067

Abstract: This paper presents a method for automatically building silver-standard NER corpora from Chinese WikipediaIn the experiments, large-scale NER corpora containing 2.3 million sentences are built from Chinese Wikipedia

Keywords: NER corpora     Chinese Wikipedia     Entity classification     Domain adaptation     Corpus selection    

Cell-Zone Method: An Engineering Approach to Predict Smoke Movement in Large Scale Building Fire

Hu Longhua,Huo Ran,Liy Uanzhou,Wang Haobo

Strategic Study of CAE 2003, Volume 5, Issue 8,   Pages 59-63

Abstract:

In large scale building fire, it is improper to predict smoke descending using traditional simpletwo-layer zone model, which divides the total space of the building into upper hot smoke layer and lowerComparison is carried out between these two methods in fire smoke development simulation in typical largethat Cell-Zone Method demonstrates more applicability than traditional simple two-layer zone model in largescale building, especially in buildings having large scale in one direction.

Keywords: large scale building     smoke movement     cell-zone method     zone-model    

Scheme comparison on large-scale infrastructure construction in shoal areas

Xian Zhengquan,Liang Jinda,Zhao Lei

Strategic Study of CAE 2010, Volume 12, Issue 4,   Pages 29-32

Abstract: : justify;">This article described the successful experience of using steel sheet pile cofferdam on building

Keywords: shoal area     large-scale infrastructure     steel sheet pile     cofferdam on building island    

Control of wind-induced vibration of long-span bridges and tall buildings

GU Ming

Frontiers of Structural and Civil Engineering 2007, Volume 1, Issue 1,   Pages 51-62 doi: 10.1007/s11709-007-0005-3

Abstract: With the rapid increase in scales of structures, research on controlling wind-induced vibration of large-scaleFor wind-induced vibration of large-scale structures, vibration frequencies and damping modes vary withMultiple degrees of freedom general building aeroelastic model with a square cross-section is testedproposed strategies can reduce vibration effectively, and can adapt to wind-induced vibration control of large-scale

Keywords: torsional buffeting     large-scale     semiactive     adjustable frequency     building aeroelastic    

Large-scale App privacy governance

Frontiers of Engineering Management   Pages 640-652 doi: 10.1007/s42524-022-0228-y

Abstract: As the number of Apps continuously increases, effective large-scale App governance is a major challengeIn this regard, we propose a quantitative method to filter out problematic Apps on a large scale.usage and number of Apps under the levels given in the PL standard, which may provoke insights into the large-scale

Keywords: privacy risk     Privacy Level     quantification     large-scale App governance    

Large Scale Infrastructure Projects: The Art of Project or Change Management?

Geert Letens,Kurt Verweire,Peter De Prins

Frontiers of Engineering Management 2016, Volume 3, Issue 3,   Pages 197-202 doi: 10.15302/J-FEM-2016033

Abstract: component of managing projects in the construction industry in general and an inevitable challenge for largescale infrastructure project in particular, there has been little to no attention in the literatureReflections on the application of this model in the construction industry and in large scale infrastructure

Keywords: large scale project management     organization development and change     batteries of change model    

Investigation on the integral output power model of a large-scale wind farm

BAO Nengsheng, MA Xiuqian, NI Weidou

Frontiers in Energy 2007, Volume 1, Issue 1,   Pages 67-78 doi: 10.1007/s11708-007-0006-x

Abstract: The integral output power model of a large-scale wind farm is needed when estimating the wind farm sThe calculation algorithms and steps of the integral output power model of a large-scale wind farm areThe characteristics of a large-scale wind farm are also discussed.

Keywords: power model     actual     energy     large-scale     practical measurement    

Shanghai Tower

Jian GONG

Frontiers of Engineering Management 2017, Volume 4, Issue 1,   Pages 106-109 doi: 10.15302/J-FEM-2017001

Abstract: Ru-jiang Zhao,Wung Hee Moh. [J]. Front. Eng, 2016, 3(2): 147-157.

Keywords: super-high-rise building     green building     integral steel platform formwork system     large volume concrete     concrete pumped for super-high building     deep and large foundation pit     combined anterograde and retrograde    

A dynamic procedure based on the scale-similarity hypotheses for large-eddy simulation

ZHOU Bing, CUI Guixiang, CHEN Naixiang

Frontiers in Energy 2007, Volume 1, Issue 4,   Pages 468-472 doi: 10.1007/s11708-007-0069-z

Abstract: Current dynamic procedures in large-eddy simulation treat the two subgrid-scale stresses in the Germano

Keywords: large-eddy simulation     Germano identity     coefficient     subgrid-scale    

Strategic Guidance Effect of Large-Scale Construction Enterprise Growth to Programme Contracting

Feng Guo,Yi-qi Chen,Yi-qing Cai

Frontiers of Engineering Management 2016, Volume 3, Issue 3,   Pages 246-251 doi: 10.15302/J-FEM-2016034

Abstract: place, the management on the organizational level and project level is separated from each other in large-scalemanagement and strategic management, this paper analyzes the relationship between the strategic growth of large-scale

Keywords: large-scale construction enterprise     enterprise growth     programme contracting     strategic interaction    

Heat transfer in a large-scale circulating fluidized bed boiler

CHENG Leming, WANG Qinhui, SHI Zhenglun, LUO Zhongyang, NI Mingjiang, CEN Kefa

Frontiers in Energy 2007, Volume 1, Issue 4,   Pages 477-482 doi: 10.1007/s11708-007-0071-5

Abstract: Heat transfer of a furnace in a large-scale circulating fluidized bed (CFB) boiler was studied based

Keywords: available     coefficient     industrial     large-scale circulating     analysis    

Large-scale model test study on the water pressure resistance of construction joints of karst tunnel

Frontiers of Structural and Civil Engineering   Pages 1249-1263 doi: 10.1007/s11709-023-0974-x

Abstract: A large-scale model test was designed and conducted, innovatively transforming the external water pressure

Keywords: karst tunnel     lining construction joint     water pressure resistance     large-scale model test     numerical    

Management and Practice of Large-Scale Modern Coal Enterprises

An Wang

Frontiers of Engineering Management 2014, Volume 1, Issue 1,   Pages 13-17 doi: 10.15302/J-FEM-2014004

Abstract: The construction of modernized mines based on "four orientations", that is, orientations of scale production

Keywords: coal industry     sustainable development     the four-orientation model    

Coupling analysis of passenger and train flows for a large-scale urban rail transit system

Frontiers of Engineering Management 2023, Volume 10, Issue 2,   Pages 250-261 doi: 10.1007/s42524-021-0180-2

Abstract: passenger and train flows is an important approach in evaluating and optimizing the operation efficiency of large-scale

Keywords: urban rail transit     coupling analysis     passenger–train interaction     large-scale simulation    

Study on System Coupling Interaction of Large-Scale Construction Companies Programme Contracting and

Feng Guo,Tian Huang

Frontiers of Engineering Management 2015, Volume 2, Issue 2,   Pages 137-140 doi: 10.15302/J-FEM-2015022

Abstract: market have resulted in individual projects being challenged to meet the long-term growth needs of largeThis paper is based on the system coupling analysis of large-scale construction enterprises and construction

Keywords: programme contracting     firm growth     coupling interaction     system     large construction companies    

Title Author Date Type Operation

Automatically building large-scale named entity recognition corpora from Chinese Wikipedia

Jie ZHOU,Bi-cheng LI,Gang CHEN

Journal Article

Cell-Zone Method: An Engineering Approach to Predict Smoke Movement in Large Scale Building Fire

Hu Longhua,Huo Ran,Liy Uanzhou,Wang Haobo

Journal Article

Scheme comparison on large-scale infrastructure construction in shoal areas

Xian Zhengquan,Liang Jinda,Zhao Lei

Journal Article

Control of wind-induced vibration of long-span bridges and tall buildings

GU Ming

Journal Article

Large-scale App privacy governance

Journal Article

Large Scale Infrastructure Projects: The Art of Project or Change Management?

Geert Letens,Kurt Verweire,Peter De Prins

Journal Article

Investigation on the integral output power model of a large-scale wind farm

BAO Nengsheng, MA Xiuqian, NI Weidou

Journal Article

Shanghai Tower

Jian GONG

Journal Article

A dynamic procedure based on the scale-similarity hypotheses for large-eddy simulation

ZHOU Bing, CUI Guixiang, CHEN Naixiang

Journal Article

Strategic Guidance Effect of Large-Scale Construction Enterprise Growth to Programme Contracting

Feng Guo,Yi-qi Chen,Yi-qing Cai

Journal Article

Heat transfer in a large-scale circulating fluidized bed boiler

CHENG Leming, WANG Qinhui, SHI Zhenglun, LUO Zhongyang, NI Mingjiang, CEN Kefa

Journal Article

Large-scale model test study on the water pressure resistance of construction joints of karst tunnel

Journal Article

Management and Practice of Large-Scale Modern Coal Enterprises

An Wang

Journal Article

Coupling analysis of passenger and train flows for a large-scale urban rail transit system

Journal Article

Study on System Coupling Interaction of Large-Scale Construction Companies Programme Contracting and

Feng Guo,Tian Huang

Journal Article